Odfjell Case Study
Learn how Odfjell, a global leader for seaborne transportation and chemical storage, became a front-runner in security and sustainability by transforming management of its tanker fleet with HxGN EAM.
Read More
Learn how Odfjell, a global leader for seaborne transportation and chemical storage, became a front-runner in security and sustainability by transforming management of its tanker fleet with HxGN EAM.
Read More
The Hexagon team worked collaboratively and seamlessly with the PDO team to improve alarm management and enhance cybersecurity.
Read More
Gain Greater Design Flexibility and Satisfy Interoperability Requirements
Read More
Daicel Corporation is using j5 Operations Management Solutions to provide better data for post-event analysis and improve shift handovers.
Read More
Energy company simplifies well handover with Intergraph Smart® Completions
Read More
For this LNG project, Intergraph Smart® Completions provides joint venture project flexibility, accuracy and transparency.
Read More
Major Engineering and Construction firm partners with Hexagon to improve project execution, cultivate confidence and trust in construction projects
Read More
Bayer AG Digitalizes P&IDs and 3D Models with Hexagon Solutions
Read More
The General Contractor for a stadium project sustained steel erection delays on prior projects, which drove up costs.
Read More
Petrolinvest Develops Plant Designs in Three Months Using CADWorx® and CAESAR II®
Read More
Godrej PED Achieves Compliance and Record Time Completion with PV Elite®
Read More
Hexagon Information Systems Technology Supports Nuclear Plant’s Decommissioning
Read More
Prokon Enhances Productivity through CADWorx® & CAESAR II® Collaboration and Automation
Read More
Using a combination of passive RFID tags, barcode labels and mobile devices to automate receipt, inventory, pick and issue processes, Jovix enabled supply chain visibility for 30,000 materials.
Read More
This mining project used over 250 suppliers and deployed Jovix to provide immediate visibility into discrepancies between project and vendor inspections for the same material.
Read More
Worley revived a Chevron refinery construction project that was abandoned years ago. Jovix helped inventory thousands of unidentified materials and tracked pieces leaving the site for refurbishment.
Read More
In addition to helping this $900M Louisiana chemical plant move 30% faster, Jovix also contributed to 59% OSBL and 63% ISBL time on tools vs. an industry standard of 34%.
Read More
In addition to losing zero materials over a two-year period, the Jovix deployment on this nuclear construction project led to a reduction in material location time by a factor of eight.
Read More
An EPC firm deployed Jovix to automate material receipt, request, location, issue, preventative maintenance and inspections. As a result, there were ZERO lost materials, leading to savings of $2.1M.
Read More
A multi-site fabricator needed more efficiency, productivity and accuracy in material management and launched a phased Jovix deployment, automating reporting and enabling progress visibility.
Read More
Loading More...